Refurbishment, extensions and conversions in Margate. Free site visit & quote07763 100 477 · · hello@margatebuilders.co.uk
MARGATE / BUILDERSMargate · Cliftonville · Westbrook · Westgate · Birchington · CT7 · CT8 · CT9

Margate · Guides

Guides for Margate homeowners.

Notes on planning, old buildings, damp and the paperwork that makes a project go smoothly.

Planning permission in Margate Old Town and Cliftonville

How conservation areas, listed buildings, flats and permitted development affect extensions, windows and roofs in Margate Old Town, Cliftonville and Westgate-on-Sea.

Read the guide

Restoring a large Victorian house in Cliftonville

What to expect when you buy or restore a big Victorian or Edwardian house that has been divided into flats, covering structure, fire safety, services, consents and phasing.

Read the guide

Listed buildings and sash windows in Margate

How to repair, draught-proof or replace sash windows in a listed building or conservation area in Margate, and when consent is needed.

Read the guide

Damp and lime in older walls

Why solid-wall houses in Margate need breathable materials, how to diagnose damp properly, and what goes wrong when cement and modern paints are used on old walls.

Read the guide

What to get in writing before building work starts

A practical list of the documents and agreements to have in place before a building project begins: quote, contract, payment schedule, changes, insurance and consents.

Read the guide

How long does a building project take?

Realistic timelines for an extension, loft conversion or renovation, from first enquiry through design, consents and on-site work to completion.

Read the guide

Turning a flat conversion back into a house

What to expect when returning a Margate house that was split into flats to a single family home: planning checks, services, structure, fire and layout.

Read the guide

Roofs and chimneys on older houses

What to check on the roof and chimneys of an older Margate house: slipped slates, flashings, pointing, redundant flues and removing a chimney breast.

Read the guide

Repairing a Victorian bay window

Why Victorian bay windows in Margate sag, crack and rot, how to tell what is wrong, and the options for repair, support and replacement.

Read the guide

Insulating an old house without trapping damp

How to insulate a solid-walled Margate house safely: loft first, floors, walls, windows, ventilation and why breathable materials matter.

Read the guide

Kitchen and bathroom renovation: the order

The sensible sequence for a kitchen or bathroom renovation: planning, strip-out, first fix, plastering, tiling and fitting, and where delays come from.

Read the guide

Building an annexe for a relative

What to check before adding an annexe or granny flat in Margate: planning, ancillary use, Building Regulations, services, access and long-term flexibility.

Read the guide

Provisional sums and variations explained

What provisional sums, prime cost sums and variations mean in a building quote, why they exist, how to keep them under control and what to get in writing.

Read the guide

Skips and scaffolding on narrow streets

The practical side of building work on a narrow Margate street: skip permits, scaffold licences, parking, deliveries, neighbours and keeping access clear.

Read the guide

Tell us what the building needs.

Free, no-obligation site visit and quote. Send a description and a few photos, and we will arrange a time to look at it properly.