Service · Loft and attic conversions
Bring roof space into use, from a bungalow loft to the attic of a tall Victorian house.
A Victorian terrace has a very different roof from a 1930s semi or a bungalow. Older cut roofs may have more usable space than modern trussed roofs, but they also need careful structural assessment. We look at the roof before suggesting a type.
A rooflight conversion is cheaper and works within the existing roof shape. A dormer gives more headroom and floor area and costs more. Which suits you depends on the pitch, the street and the budget.
Some of Margate's tall houses already have attic rooms, often in poor condition. Bringing them up to standard involves insulation, fire safety, floors and a proper stair, and in a conservation area the work visible from the street needs care.
A rooflight loft conversion typically runs £20,000 to £40,000 and a dormer £50,000 to £75,000. On-site time is typically 6 to 10 weeks. Building Regulations approval is needed and neighbours must be notified if a party wall is involved.
On every job
Free site visit & quoteWritten quoteSame team on siteTell us about the project at hello@margatebuilders.co.uk or call 07763 100 477. WhatsApp works too. We'll arrange a site visit to give you a proper quote.
Free, no-obligation site visit and quote. Send a description and a few photos, and we will arrange a time to look at it properly.