Insulating an old house without trapping damp
Older houses were built to breathe. Insulate them carelessly and you can trade a cold house for a damp one.
How old houses work
Solid brick or stone walls absorb moisture and release it again as the weather changes. Lime mortars and plasters help that happen. If you cover the walls with something that stops moisture getting out, it can build up in the wall, in joist ends or behind finishes. That is why insulation in an older house needs thought.
Start with the easy wins
The loft is usually the simplest and most effective place. Add insulation while keeping the roof space ventilated, and keep it clear of the eaves so air can move. Draught-proofing doors and windows is also cheap and effective. Do these before anything more complicated.
Floors
Many older houses have suspended timber floors over a ventilated void. Insulating between the joists from above or below can reduce draughts, but the air bricks have to stay clear and the void ventilated or the timbers can rot. Never block air bricks.
Walls
Solid walls lose a lot of heat, but insulating them is the riskiest option. Internal insulation reduces room size and can cause moisture problems at joist ends and in corners if poorly done. External insulation changes the look of the house and may need planning permission, especially in a conservation area. If you go this route, use materials designed to cope with moisture and have the details checked.
Windows
Original sashes can be draught-proofed and fitted with secondary glazing to improve comfort. Replacement double glazing is another route, and in a conservation area or listed building consent may be needed. Think about ventilation if you make the house much tighter.
Ventilation matters
The tighter the house, the more it needs controlled ventilation. Extractor fans in kitchens and bathrooms, trickle vents and open flues need to work. Condensation and mould are signs of too much moisture and too little air movement.
Heating comes after
Reducing heat loss first means you can often use a smaller and cheaper heating system. Ask about the sequence: fabric first, then heating.
Be careful with advice
Treat sweeping claims with caution, and be wary of anyone who proposes a single product for the whole house. Look for someone who asks about the construction of your particular walls and floors before recommending anything.
Breathable materials
Materials such as wood fibre, sheep's wool, cork and lime-based products can cope with moisture moving through them, whereas some foams and boards do not. They are not magic and they need careful detailing, but they suit solid walls better. Ask the person proposing insulation why they have chosen the material and what happens to moisture.
Whatever the material, the wall construction and the exposure of the house decide what is suitable, so ask for that reasoning to be explained.
Monitoring after the work
After insulating, watch for new damp patches, mould, musty smells or condensation on windows. These are signs that moisture is not escaping. Keep ventilation working. If problems appear, tell the installer early and get the cause diagnosed before they spread.
Questions to ask an installer
What is my wall made of? What is behind the plaster? What happens to moisture? How will the joist ends be protected? What ventilation will I have afterwards? Who is responsible if damp appears in the first years? A person who cannot answer these, or who offers the same system for every house, is not a good sign.
It is also worth asking whether the work needs Building Regulations approval, which depends on what is being done, and whether any consent is required in a conservation area.
Putting it together
A sensible plan for an old house is a sequence: fix leaks and damp problems, insulate the loft, draught-proof, deal with floors if suitable, improve the windows, then consider the walls and the heating last. Each step reduces heat loss and builds your understanding of how the house behaves.
Damp and lime
If you already have damp, deal with the cause before insulating. Our guide on damp and lime in older walls sets out why damp-proofing and plastering decisions should be made on the right diagnosis.
Related pages
- Damp and lime in older walls
- Whole-house refurbishment
- Restoring a large Victorian house in Cliftonville
Free site visit and quote
Tell us about the project at hello@margatebuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.