Roofs and chimneys on older houses
On a seafront house, the roof takes the worst of the weather. Small defects up there become damp patches indoors long before anyone sees them from the ground.
Look from the ground first
Stand across the road, or use binoculars, and look for slipped, cracked or missing tiles or slates, sagging ridges, loose or missing pointing along the ridge and hips, and moss or vegetation. Look at chimney stacks for leaning, cracked pointing, loose pots and staining. Check gutters and downpipes for overflow marks on walls, which suggest blockages or leaks.
Inside the loft
With a torch, look for daylight where there should be none, stained or damp timbers, and drips after rain. Check where the chimney passes through. Look for signs of woodworm or rot. If you have roof felt, see whether it is torn or perished. Take care to stay on the joists and do not step on the ceiling.
Flashings and valleys
Where a roof meets a wall, a chimney or another roof, metal flashings keep water out. They are a common source of leaks, as they fail at joints and edges. Older houses often have cement fillets, which crack. Re-doing flashings in lead or a suitable alternative is a skilled job and worth getting right.
Chimneys
Chimney stacks take wind, rain and salt. Pointing erodes, bricks crumble and the flaunching, the mortar at the top that holds the pots, cracks. A leaning stack is a safety issue. Unused flues should be capped but ventilated, as a sealed flue can cause damp problems. Ask your builder to deal with this properly.
Removing a chimney breast
People remove chimney breasts to gain space. If the chimney stack above is left, it needs supporting, typically with steel or brackets, and a structural engineer should design it. Building Regulations apply, and the neighbour may be involved if the chimney is shared. Think about the stack on the roof as well as the breast inside.
Repair or re-roof?
Patching suits localised damage. When tiles are failing widely, battens are rotten or there is no underlay, re-roofing is more economical than repeated repairs. Ask for the reasoning, and for photographs of what has been found. Reusing sound original slates or tiles can keep the character of the house.
Scaffolding
Most roof work needs scaffolding, and it can be a large part of the cost. If you are planning several jobs, such as roof, chimney, windows and painting, do them while the scaffold is up. Ask for this to be planned.
Birds and bats
Wild birds are protected while they are nesting, which affects the timing of some work, and bats and their roosts are protected throughout the year. If either is found, work may have to be adjusted or stopped. Ask about it before the job starts.
Cost and priorities
Roof work is often urgent because water damage spreads. A sensible order is to stop water getting in first, then repair what is damaged, then deal with the improvements. A small repair now is usually cheaper than a large one after a winter of leaks.
Ask for a written list of what is needed now, what can wait a year and what is optional.
Checks after the work
After the work is done, ask for photographs of the finished roof and chimney, and of any hidden repairs made on the way. Check the gutters run freely in the next heavy rain. Look inside the loft again to be sure the leaks have stopped, and again after a storm.
Choosing who to trust
Roofing is an area where unsolicited callers are common, often claiming to have spotted a problem while passing. Be cautious about anyone who knocks on the door and pressures you to agree to work on the spot. Ask for a written quotation, photographs of the problem taken from your own roof or by a person you have invited, and take time to compare. Many consumer contracts signed away from the trader's premises carry a 14-day cancellation right, and the trader must tell you about it.
Weather on the coast
Exposed roofs need good fixings. Wind can lift ridges, hips and edge tiles. Ask how everything will be fixed down and whether the specification suits an exposed position.
Related pages
Free site visit and quote
Tell us about the project at hello@margatebuilders.co.uk or on WhatsApp. We'll arrange a site visit to give you a proper quote.